Phase 5: Finishing Touches

Back to Gallery | Before Photos | Phase 1 | Phase 2 | Phase 3 | Phase 4 | Phase 5 | Completed Project

Nearly 2 years after the start of Phase 1, the last few projects are underway and the final punch-list created. The theater is almost ready for its premiere!


The first fabric covered panels are installed.


Drapes and carpet installed.


Stage construction (with subwoofer ports).


Morrie, the owner of Seattle Curtain (right) personally oversees the installation of the drapes and curtains.


Location for front curtain motor.


Snack bar awaiting caulking, fridge, microwave, brass sink, and fixtures.


Fan system in utility room next to media closet. A thermostat just above the rack activates the fan when the air temperature rises to a preset level to draw warm air away from the rack in order to protect the equipment.


Medallions and molding installed on the stage.


Ceiling panels are covered with textured wallpaper and installed.


Glass installed into tops of columns.


Bulbs and frosted plexiglass installed in wreath fixtures.


Back row of recliners installed.


Stewart GreyHawk screen mounted and gold frame wrapped around.


Textured drop-ceiling complete and lights installed.


Awaiting last two rows of seating and stair lights.

Back to Gallery | Before Photos | Phase 1 | Phase 2 | Phase 3 | Phase 4 | Phase 5 | Completed Project

Copyright ©2008 Steve Jenkins Holdings LLC. All rights reserved.

Video Game Cheats | PS3 Cheats | PS2 Cheats | PlayStation Cheats | Xbox 360 Cheats | Xbox Cheats | Nintendo Wii Cheats | Nintendo GameCube Cheats | Nintendo N64 Cheats | PSP Cheats | Nintendo DS Cheats | Game Boy Advance Cheats | Game Boy Cheats | Nokia N-Gage Cheats | Sega Dreamcast Cheats | PC Game Cheats | GameRadar Video Game Website Directory