The first fabric covered panels are installed.

Drapes and carpet installed.

Stage construction (with subwoofer ports).

Morrie, the owner of Seattle Curtain (right) personally oversees the installation of the drapes and curtains.

Location for front curtain motor.

Snack bar awaiting caulking, fridge, microwave, brass sink, and fixtures.

Fan system in utility room next to media closet. A thermostat just above the rack activates the fan when the air temperature rises to a preset level to draw warm air away from the rack in order to protect the equipment.

Medallions and molding installed on the stage.

Ceiling panels are covered with textured wallpaper and installed.

Glass installed into tops of columns.

Bulbs and frosted plexiglass installed in wreath fixtures.

Back row of recliners installed.

Stewart GreyHawk screen mounted and gold frame wrapped around.

Textured drop-ceiling complete and lights installed.

Awaiting last two rows of seating and stair lights.