Jenkins Home Theatre
HomeArticlesEquipmentPhoto GalleryDownloadsPress CoverageLinksFAQsContact

Phase 3: Construction and Installation

Back to Gallery | Before Photos | Phase 1 | Phase 2 | Phase 3 | Phase 4 | Phase 5 | Completed Project

Once all the elements were fabricated, it was time to start putting the room together and installing the speakers.


First step in creating the screen wall. Insulation needs to be removed to install speakers.


Framework installed for the box ceiling molding.


Wires and conduit leaving the media closet.


Side speakers installed.


More box ceiling framework.


Framework installed around dome.


Front speakers installed and ceiling molding being installed.


Wreaths and ceiling molding completely installed and awaiting ceiling panels and columns.


Rear speakers installed.


Front speakers mounted.


Pillar posts installed.


Base of pillar mounted.


Pillar top half and capital put into place.


Pillar completely installed.


Close-up of installed pillar capital and light fixture.

Back to Gallery | Before Photos | Phase 1 | Phase 2 | Phase 3 | Phase 4 | Phase 5 | Completed Project

Copyright ©2008 Steve Jenkins Holdings LLC. All rights reserved.

Video Game Cheats | PS3 Cheats | PS2 Cheats | PlayStation Cheats | Xbox 360 Cheats | Xbox Cheats | Nintendo Wii Cheats | Nintendo GameCube Cheats | Nintendo N64 Cheats | PSP Cheats | Nintendo DS Cheats | Game Boy Advance Cheats | Game Boy Cheats | Nokia N-Gage Cheats | Sega Dreamcast Cheats | PC Game Cheats | GameRadar Video Game Website Directory