Phase 2: Fabrication

Back to Gallery | Before Photos | Phase 1 | Phase 2 | Phase 3 | Phase 4 | Phase 5 | Completed Project

Everything in the room needed to be custom fabricated from scratch. Designer Todd Evans crafted all of the elements by hand off-site before bringing them to the house to be installed.


The entire plaster fabrication process. The item is hand carved in wax, then a latex mold is made. The item is cast in plaster, dried, sanded, and then painted.


Wax original of the ceiling wreaths.


Wax original of the pillar capital.


Wax original of the pillar base.


All three original wax pillar segments (bottom, top, & capital).


Ceiling wreath plaster poured into mold (hanging hooks installed in reinforcing mesh).


Pouring the wreaths.


Bottom half of pillar in mold.


Early pillar mold process.


Pillar segments in drying room.


More pillars drying.


Final stages of drying.


Medallions and frame pieces drying.


Close-up of medallion and accent leaves.


Pillar capitals drying.


Sanding pillars prior to installation and painting.


Painting the ceiling wreaths.


Test assembly of pillar to evaluate dimensions.


Test pillar painted.


Finished medallion.


Finished frame corners.


Finished pieces stored in adjacent room awaiting installation.

Back to Gallery | Before Photos | Phase 1 | Phase 2 | Phase 3 | Phase 4 | Phase 5 | Completed Project

Copyright ©2008 Steve Jenkins Holdings LLC. All rights reserved.

Video Game Cheats | PS3 Cheats | PS2 Cheats | PlayStation Cheats | Xbox 360 Cheats | Xbox Cheats | Nintendo Wii Cheats | Nintendo GameCube Cheats | Nintendo N64 Cheats | PSP Cheats | Nintendo DS Cheats | Game Boy Advance Cheats | Game Boy Cheats | Nokia N-Gage Cheats | Sega Dreamcast Cheats | PC Game Cheats | GameRadar Video Game Website Directory