Phase 1: Demolition, Design, and Pre-wire

Back to Gallery | Before Photos | Phase 1 | Phase 2 | Phase 3 | Phase 4 | Phase 5 | Completed Project

Our builder had already begun some early stages of a media room, but we needed to remove most of it to fit the design we had in mind.


Beginning of drywall demolition.


Removing lights and drywall.


Exposed floor joists and wiring.


Chipboard installed for sound dampening.


Drywall removed to allow conversion of media closet door to pocket door (also involved rerouting vaccuum outlet).


Installing drywall over chipboard.


Re-mudding media closet and installing lights.


Experimenting with screen sizes based on proposed seating distances.


Installing conduit and wiring.


Conduit outlet locations in media closet.


Experimenting with different box ceiling and dome designs and sizes.


Close-up of box ceiling construction.


Removal of front wall to allow access for installing snack bar sink drain, speakers, and screen frame.

Back to Gallery | Before Photos | Phase 1 | Phase 2 | Phase 3 | Phase 4 | Phase 5 | Completed Project

Copyright ©2008 Steve Jenkins Holdings LLC. All rights reserved.

Video Game Cheats | PS3 Cheats | PS2 Cheats | PlayStation Cheats | Xbox 360 Cheats | Xbox Cheats | Nintendo Wii Cheats | Nintendo GameCube Cheats | Nintendo N64 Cheats | PSP Cheats | Nintendo DS Cheats | Game Boy Advance Cheats | Game Boy Cheats | Nokia N-Gage Cheats | Sega Dreamcast Cheats | PC Game Cheats | GameRadar Video Game Website Directory